Virtus Group logo

Virtus Group - Infrastructure Operations Runbook

v1.2 FINAL • Standardised 2025-09-04
Owner: Virtus Group Ltd • Audience: Clients, Reviewers & Operations • Classification: Public • Next Review: 2026-09-04

Executive Summary

This document describes Virtus Group’s standard for this area and how it is applied in practice. It is derived from our internal policies and standards and is intended for both reviewers and operations.

Scope & Assumptions

Requirements (Key Controls)

Procedures / Playbooks

Change ClassNotes
StandardPre-approved steps with low risk
NormalCAB review, backout plan
EmergencyExpedited approval, post-implementation review

Roles & RACI

RoleResponsibility
Service OwnerApproves changes; accountable for outcomes
Duty EngineerExecutes runbook tasks and reports status
CAB (as needed)Reviews non-standard/emergency changes

Baseline Targets

  • Change windows aligned to SLAs; emergency changes follow expedited CAB
  • Backup/restore aligned to BCDR baselines (see tiers and testing cadence)

KPIs & Reporting

Evidence & Records

Records are maintained per the VGL Document & Record Control guidelines, including logs, approvals, test outputs, meeting minutes, and reports.

© Virtus Group Ltd — Final version.